EJCDC® CMA 942, Field Order—Construction Manager as Advisor Series (2021)

EJCDC® CMA 942, Field Order—Construction Manager as Advisor Series (2021)

$54.00

EJCDC® CMA‑942, Field Order is used by the Construction Manager to order minor changes to the Work that do not change the Contract Price or Contract Times. See Paragraph 11.04, EJCDC® CMA‑700, Standard General Conditions of the Construction Contract—Construction Manager as Advisor Series (2021).

Description

EJCDC® CMA‑942, Field Order is used by the Construction Manager to order minor changes to the Work that do not change the Contract Price or Contract Times. See Paragraph 11.04, EJCDC® CMA‑700, Standard General Conditions of the Construction Contract—Construction Manager as Advisor Series (2021).