EJCDC® CMA‑052 Owner’s Instructions to Construction Manager Concerning Bonds and Insurance (2021), presents model language for the Owner’s use in responding to the Construction Manager’s request for written instructions from the Owner regarding bond and insurance requirements to be included in the bidding/procurement and construction contract documents. The document is premised on Owner using the Bonds/Insurance Excerpt (previously provided to Owner by Construction Manager, as Attachment B to a letter based on EJCDC® CMA‑051, Construction Manager’s Letter to Owner Requesting Instructions Concerning Bonds and Insurance (2021)), to provide key information, such as required insurance coverage limits, and make desired revisions to the insurance specifications in the Excerpt.
CMA-052 Owner’s Instructions to Construction Manager Concerning Bonds and Insurance
$58.00
EJCDC® CMA‑052 Owner’s Instructions to Construction Manager Concerning Bonds and Insurance (2021), presents model language for the Owner’s use in responding to the Construction Manager’s request for written instructions from the Owner regarding bond and insurance requirements to be included in the bidding/procurement and construction contract documents. The document is premised on Owner using the Bonds/Insurance Excerpt (previously provided to Owner by Construction Manager, as Attachment B to a letter based on EJCDC® CMA‑051, Construction Manager’s Letter to Owner Requesting Instructions Concerning Bonds and Insurance (2021)), to provide key information, such as required insurance coverage limits, and make desired revisions to the insurance specifications in the Excerpt.