The 2018 edition of EJCDC C-940, Work Change Directive is designed to perform in conjunction with the 2018 Change Order (C-941).
View cart “C-625 Certificate of Substantial Completion” has been added to your cart.
C-940 Work Change Directive
$82.00
The 2018 edition of EJCDC C-940, Work Change Directive is designed to perform in conjunction with the 2018 Change Order (C-941).
Related products
-
C-052 Owner’s Instructions to Engineer Concerning Bonds and Insurance
$54.00 Add to cart -
C-410 Suggested Bid Form for Construction Contracts
$152.00 Add to cart -
C-430 Bid Bond: Penal Sum Form
$152.00 Add to cart -
C-625 Certificate of Substantial Completion
$82.00 Add to cart -
C-523 Construction Subcontract
$160.00 Add to cart